Project Description
Pavement resurfacing and reconstruction on various city streets, county and township roads. This project is funded through the Mid-Ohio Regional Planning Commission (MORPC) allocation of highway funding provided by the 2009 American Recovery and Reinvestment Act (the federal stimulus bill). This project is being sponsored by Delaware County, and is a cooperative effort between MORPC, Ohio Department of Transportation, the cities of Delaware and Powell, Village of Sunbury, as well as Orange, Liberty and Concord Townships.
Construction Updates
Phase 2 complete: The second phase of the resurfacing project was completed May 29. This work included microsurfacing of 8 miles of county and township roads.
The first phase of the Delaware County ARRA funded resurfacing project was completed in October 2009, which included asphalt resurfacing of over 6 miles of township roads and city streets.
Road Closure Information
Closure to through traffic on the following roads:
- London Road (Delaware) closed between U.S. 42 and the Advanced Auto driveway.
- Cheshire Road (Sunbury) closed in the Sunbury village limits (about 1/2 mile west of Cottontail Drive) with local traffic maintained
On all other roads, one lane, two-way operation of traffic will be maintained with flaggers in the work zones. Brief closures may also be required.
Project Schedule
Design engineering: May to June 2009
Right-of-way acquisition: None
Utility relocation: None
Construction: Oct. to Nov. 2009 (Phase 1); May 2010 (Phase 2)
Project Work Locations and Schedule
Road Name | From | To | Work Type & Schedule |
London Road (Delaware) | U.S. 42 | Advanced Auto Driveway | Concrete pavement reconstruction (closure)
Opened Nov. 5 |
Liberty Road (Delaware) | Freedom Lane (Delaware) | London Road (Delaware) | Asphalt resurfacing (traffic maintained)
Completed Nov. 11 |
Cheshire Road (Delaware) | U.S. 23 | Braumiller Road | Asphalt resurfacing (traffic maintained)
Completed Oct. 30 |
Liberty Street (Powell) | CSX Railroad | Olentangy St. (S.R. 750) | Asphalt resurfacing (traffic maintained)
Completed Nov. 3 |
Cheshire Road (Sunbury) | Sunbury village limit | U.S. 36 | Base reclamation & resurfacing (closure)
Opened Oct. 23 |
Africa Road (CR 21) | Worthington Road | Lewis Center Road | Microsurfacing (traffic maintained)
Completed May 26 |
Harriott Road (CR 131) | Concord Road | S.R. 745 | Microsurfacing (traffic maintained)
Completed May 28 |
Lewis Center Road (CR 106) | Olentangy H.S. | Woodstone Drive | Microsurfacing (traffic maintained)
Completed May 29 |
Concord Road (TR 129) | Dublin city limit | Cook Road | Microsurfacing (traffic maintained)
Completed May 28 |
Bale Kenyon Road (TR 107) | Powell Road | Lewis Center Road | Asphalt resurfacing (traffic maintained)
Completed Nov. 5 |
Orange Road (TR 114) | Perry Road | U.S. 23 | Asphalt resurfacing (traffic maintained)
Completed Nov. 7 |
Engineering Information
Construction documents prepared by the Delaware County Engineer’s Design Department.
Construction Information
Contract awarded to Shelly Company ($1,795,005). 100% funded by the 2009 American Recovery and Reinvestment Act.
Estimated Project Cost
$1.85 million