Project Description

Preventative resurfacing and pavement maintenance on various county and township roads.

Contact the County Engineer’s Office for information about township roads.

 

County Road Resurfacing Program

From To Work Type
Old Worthington Rd. (CR 13) Orion Pl. Polaris Pkwy. SAMI seal & microsurfacing
Africa Rd. (CR 21) Lewis Center Rd. Cheshire Rd. Chip seal & microsurfacing
Gorsuch Rd. (CR 27) Red Bank Rd. Harlem Rd. Chip seal & fog seal surface
3 B’s & K Rd. (CR 35) U.S. 36 Kilbourne Rd. Asphalt paving and chip seal
Meredith State Rd. (CR 46) Condit Rd. N. County Line Rd. Chip seal & fog seal surface
County Home Rd. (CR 65) U.S. 42 S.R. 521 Chip seal & microsurfacing
Kilbourne Rd. (CR 65) S.R. 521 S.R. 61 Chip seal & microsurfacing
Leonardsburg Rd. East (CR 80) U.S. 42. N. Old State Rd. Chip seal & fog seal surface
Gregory Rd. (CR 96) Cheshire Rd. Berlin Station Rd. Base reclamation and asphalt paving
Manley Rd. (CR 128) Dublin Corp. Limit Union County Line Asphalt paving
Norton Rd. (CR 202) S.R. 203 Norton-Waldo Rd. Chip seal & fog seal surface
Curtis Rd. (CR 203) S.R. 203 Marion County Line Chip seal & fog seal surface
Leonardsburg Rd. West (CR 221) Horseshoe Rd. U.S. 42 Chip seal & fog seal surface

 

Construction Updates

Click Here for the current construction schedule!

 


Road Closure Information

Traffic to be maintained in the work zones using flaggers and a minimum of 1-lane, 2-way operation. Brief closures may also be required.

 


Project Schedule

Design engineering: Fall 2009 to spring 2010

Right-of-way acquisition: None

Utility relocation: None

Construction: May to September 2010

 


Engineering Information

Construction documents prepared by the Delaware County Engineer’s Design Department.

 


Construction Information

Contract awarded to Shelly & Sands

  • $2,390,852 for county roads
  • $3,427,160 for township roads

 


Estimated Project Cost

$5.9 million (County and Township)