Project Description

Replacement of a narrow, twin-barrel structural plate culvert with a 28′ span concrete arch culvert. Project is being coordinated with the construction of a turn lane for the proposed Fiddler’s Creek subdivision south of Home Road.

 


Road Closure Information

Road closed to through traffic with detour posted. Local traffic maintained to nearby residences.

 


Project Schedule

Design engineering: December 2006 to May 2007

Right-of-way acquisition: May to August 2007

Utility relocation: September 2007

Construction: October 2007 to April 2008

 


Engineering Information

Construction plans by the Delaware County Engineer’s Design Department.

 


Construction Information

Contract awarded to Vititoe Construction of Ostrander, Ohio for $208,673. Precast concrete arch culvert supplied through contract with Contech Bridge Solutions, Columbus, Ohio for $115,828.

 


Estimated Project Cost

$360,000