Project Description
Replacement of a narrow, steel jack arch bridge in poor structural condition. Project includes removal of existing bridge, and installing a 28 x 10 precast, reinforced concrete arch culvert. Approach improvements including pavement and shoulder widening, drainage improvements, and guardrail installation complete the project.
Project Location and Limits:
Hartford Road about ¼ mile east of Ross Road. Total project length is about 400 feet.
Road Closure Information
Road closed to through traffic with detour posted. Local resident traffic maintained.
Project Schedule
Design engineering: November 2003 to February 2004
Right-of-way acquisition: April to July 2005
Utility relocation: June 2005 to January 2006
Construction: April to June 2006
Engineering Information
Construction documents prepared by the Delaware County Engineer’s Design Department.
Construction Information
Built by Delaware County Highway Department.
Estimated Project Cost
—