The CR 605 Shoulder Widening and Resurfacing Project, between SR 37 and Murphy Road in Trenton Township, will begin Tuesday (8/1) and run thru Saturday (9/30). One Lane Two-Way traffic will be maintained with the use of flaggers.
The CR 605 Shoulder Widening and Resurfacing Project, between SR 37 and Murphy Road in Trenton Township, will begin Tuesday (8/1) and run thru Saturday (9/30). One Lane Two-Way traffic will be maintained with the use of flaggers.