The County Commissioners adopted updated text of the County Engineer’s Design, Construction and Surveying Standards Manual on January 22, 2008. These Standards take effect beginning January 30, 2008. Please check this website for the most up to date information.
Standards Manuals
Title | Download | Revised |
2008 Complete Standards Manual Without Appendix:
On the Table of Contents on pages 5-8 of this document, click your mouse on the desired area of the Table of Contents to go to the related Article or Subarticle of the Standards |
Standards without Appendix | 1/22/2008 |
Manual Sections: | ||
STANDARDS MANUAL COVERSHEET AND CREED | Coversheet & Creed | 1/22/2008 |
TABLE OF CONTENTS for Articles I through XII | Standards Table of Contents | 1/22/2008 |
Revisions Summary from the Previous Standards | Revisions Summary | 1/22/2008 |
GENERAL | Article I | 1/22/2008 |
GENERAL PLAN DEVELOPMENT PROCEDURE | Article II | 1/22/2008 |
PRELIMINARY ENGINEERING PLAN | Article III | 1/22/2008 |
FINAL ENGINEERING AND CONSTRUCTION PLAN | Article IV | 1/22/2008 |
PROVISIONS AND GUARANTEE REQUIRED BY OWNER | Article V | 1/22/2008 |
STREET & BRIDGE DESIGN STANDARDS | Article VI | 1/22/2008 |
PAVEMENT DESIGN | Article VII | 1/22/2008 |
WORK IN ROAD RIGHT-OF-WAY OR EASEMENTS | Article VIII | 1/22/2008 |
DRAINAGE DESIGN STANDARDS | Article IX | 1/22/2008 |
SURVEYING STANDARDS | Article X | 1/22/2008 |
PROCEDURES AND REQUIREMENTS FOR CONSTRUCTION | Article XI | 1/22/2008 |
STORMWATER QUALITY | Article XII | 1/22/2008 |
INDEX TO ARTICLES | Index | 6/30/2010 |
Appendix: | ||
APPENDIX TABLE OF CONTENTS | Appendix Table of Contents | 6/30/2010 |
Addendums
Recent Updates Made or Additions to Appendix Recent Memorandums |
Appendix A | 6/30/2010
11/30/2010 07/27/2023 |
Supplemental Specifications | Appendix B | 05/02/2014 |
Roadway and Storm Sewer Standard Drawings
Roadway Standard Drawings Storm Sewer Standard Drawings |
Appendix C: | 6/30/2010 |
General Notes | Appendix D | 6/30/2010 |
Submission Cover Document, Review Checklists, and Design Aids Please call 740-833-2423 if you need any checklists not yet posted | Appendix E | 12/08/2023 |
Sample Owner’s Agreement, Standard Unit Prices, and Sample Engineer’s Estimate | Appendix F | 11/30/2010 |
Work in Right-of-Way Permit Forms and Utility Policy | Appendix G | 6/30/2010 |
Drainage Maintenance Process & Sample Petitions | Appendix H | 11/4/2011 |
Traffic Impact Study (TIS) Standards | Appendix I | 6/30/2010 |
Proposed Right-of-Way and Property Conveyance Requirements | Appendix J | 6/30/2010 |
This section to be posted soon. Please call 740-833-2426 for any questions. | Appendix K | 6/30/2010 |