Project Description:

The Delaware County Engineer’s Office is currently developing plans for improvements to Berlin Station Road.  The proposed work extends from the intersection of Berlin Station Road and Braumiller Road east to the limits of the recently completed roundabout at Glenn Parkway.  The project will be constructed in two phases.  Phase 1A will include minor widening of Berlin Station Road, as well as adjusting the roadway grade and replacing the large culvert on the south leg of the intersection.  Phase 1B will include construction of a single-lane roundabout at the intersection.

Phase 1A:

Phase 1B:

Schedule:

Design and Engineering: 2019 to 2021

Right-of-Way Acquisition: 2021 to 2022

Construction: Summer/Fall 2022

Schedule:

Design and Engineering: 2019 to 2021

Right-of-Way Acquisition: TBD (2025 to 2027)

Construction: TBD (2027 or later)

On Berlin Station Road, one lane of traffic will be maintained in the eastbound direction for the duration of the project. It is anticipated that the south leg of Braumiller Road will be closed for about 2 months during summer of 2022. Please note the above dates are approximate and are subject to change as the project progresses. Public notification of closures will be given through the DCEO. The intersection is expected to close for about 2 months to build the roundabout.  Public notification of closures will be given through the DCEO.

Cost:

The current cost of construction is approximately $1.91 million dollars.

Cost:

The current cost of construction is approximately $1.3 million dollars.

Public Meeting Materials:

#1 Public Comment Sheet

#2 Project Fact Sheet – Phase 1A

#3 Phase 1A – Exhibit (2022)

#4 Project Fact Sheet – Phase 1B

#5 Phase 1B – Exhibit (2027+)

 

For Questions or Comments:

Please contact Tiffany Jenkins, P.E., Project Manager by email at tjenkins@co.delaware.oh.us