SUBMITTALS:
- All plan review documents should be submitted digitally via email to cgreen@co.delaware.oh.us. All development submittals are required to include a completed “Review Submittal Coversheet” (attached).
- All payments should be submitted online or by mail. Online payments may be made at the following link: https://client.pointandpay.net/web/DelawareCountyEngineerOH
- This page has been provided to assist consultants and contractors who are performing work in Delaware County. This information is updated as needed. More design information is available at ODOT Design Reference Resource Center.
General Information
Revised |
|
| Review Submittal Coversheet (PDF) | 10/21/2025
02/10/2022 |
| Commercial and Industrial Sites Plan Process | 6/10/2013 |
| Common Access Drive (CAD) Subdivisions | |
| Common Questions and Review Timeframes | |
| Ditch Setback Plans Plan Process | |
| Lot Split Submission Process | 6/27/2011 |
| Plat Process | |
| Road Widening Plan Process | |
| Subdivision Plan Process | 6/10/2013 |
Plan Review Checklists
CHECKLIST DISCLAIMER: Checklists cannot be written that address every item on a particular project but the following should address most of the common review issues.
Revised |
|
| Subdivisions | |
| CAD Submission Checklist | 5/15/2013 |
| Final Engineering Plan Submission Checklist | 04/15/2025 |
| Final Plat Submission Checklist | 03/29/2024 |
| Preliminary Engineering Plan Submission Checklist | 4/17/2024 |
| Other | |
| Commercial & Industrial Plan Submission Checklist | 1/20/2026 |
| Ditch Setback Plan Submission Checklist | 3/5/2013 |
| Lot Split Submission Checklist | 4/02/2025 |
| Road Widening Plan Submission Checklist | 07/29/2024 |
Additional Information
Revised |
|
| Plan Notes: To request Required Plan Notes, email cgreen@co.delaware.oh.us and include “Subdivision Plan Notes Request” or “Commercial Plan Notes Request” in the email heading. | 6/30/2010 |
| Delaware County Unit Costs Spreadsheet (PDF) | 11/4/2011 |
| Ditch Setback Sample Plan for Lot Splits | 8/26/2019 |
| Easement Vacation Process | 4/21/2014 |
| Legal Description Example | — |
| Proposed Right-of-Way Widths | 4/2/2007 |
| Sample Annual DM Estimate | 10/23/2014 |
| Sample Decision Sight Distance Exhibit | — |
| Sample Drainage Conveyance Document | 05/6/2021 |
| Sample NPA Drainage Conveyance Document | 03/23/2022 |
| Sample Inspection Fee Estimate | 10/30/2014 |
| Sample NPA Highway Conveyance Document | 03/20/2026 |
| Stopping Sight Distance Example | 10/31/2025 |
| Table of Pavement Elevations | 6/30/2010 |
| Traffic Impact Study (TIS) Standards | 9/16/2001 |
| Utility Contacts Information
|
9/18/2007 |
| Sample As-Built Plan Certification Letter | 01/11/2024 |
| Storm Basin Data Table (PDF) | 2/8/2008 |
Drainage Maintenance Petitions
Revised |
|
| Drainage Improvement Petition Procedure
Commercial Site Drainage Maintenance Petition |
11/4/2025 |
Thoroughfare Plan
For the Traffic Impact Study Standards which are located in Appendix I of the Standards, click here.
Revised |
|
| Map #1 | 12/18/2001 |
| Map #2 | 12/18/2001 |
| Map #3 | 12/18/2001 |
| Map #4 | 12/18/2001 |